Rabu, 10 Maret 2010

PERENCANAAN SPILLWAY BENDUNGAN KEDUNG WARAK KABUPATEN NGANJUK

PERENCANAAN SPILLWAY BENDUNGAN KEDUNG WARAK KABUPATEN NGANJUK

THE DESIGN OF KEDUNG WARAK DAM SPILLWAY NGANJUK REGENCY

Created by :
SUSILONINGSIH ( )


Subject: Spillwways
Keyword: Perencanaan
Dimensi pelimpah
Stabilitas

[ Description ]

Alasan yang mendasari perlu dibangunnya bendungan pada daerah Nganjuk antara lain karena run off dari sungai . sungai kecil melimpah pada musim hujan dan hampir kering pada musim kemarau. Potensi lokasi sumber air yang dapat dijadikan waduk salah satunya adalah di Kali Gondang yang merupakan anak sungai Widas yang terletak di Desa Ngluyu, Kecamatan Ngluyu dan untuk rencana as bendungan terletak di desa Kedung Warak. Rata . rata curah hujan tahunan adalah 1.650 mm/tahun berdasarkan data selama 20 tahun dari 3 stasiun hujan, yaitu stasiun Bangle di Kecamatan Lengkong, Gondang di Kecamatan Gondang dan Tempuran di Kecamatan Ngluyu. Ketiga stasiun tersebut terletak di Kabupaten Nganjuk. Luas tangkapan hujan di DAS Kedung Warak adalah seluas 30.76 km2 dengan total panjang sungai di semua ordo sepanjang 68.96 km. Dari hasil perhitungan perencanaan dengan menggunakan debit rencana 1000 tahun (Q1000th) didapatkan dimensi Spillway dengan lebar sebesar 45 m, elevasi puncak Spillway terletak pada ± 161 dengan dasar waduk terletak pada ± 159, elevasi puncak Tubuh Bendung terletak pada ± 164.25. Untuk perencanaan kolam olak dipakai kolam olak USBR tipe III dengan panjang kolam olak sebesar 3.5 m. Dari perencanaan didapatkan dimensi Spillway kemudian dilakukan perhitungan stabilitas terhadap guling, geser dan retak. Perhitungan kestabilan dihitung pada saat kondisi paling kritis, yaitu pada saat kondisi muka air setinggi puncak Spillway dan pada saat kondisi muka air setinggi debit rencana. Dari hasil perhitungan kestabilan didapat kesimpulan bahwa kestabilan Spillway memenuhi syarat.

Alt. Description

The main reason why to build a dam in Nganjuk Regency is needed are run off of river is excessive in the rainy season and dry in the dry season. One of the potential water resources is Gondang River which is one of tributaries of Widas River in Ngluyu Village, Ngluyu District and the midpoint of dam is located in Kedung Warak Village. The annual average rainfall intensity is 1650 mm / year, based on 20 years data of three rain stations, namely: Bangle rain station in Lengkong district, Gondang rain station in Gondang district and Tempuran rain station. All of them are located in Nganjuk Regency. The catchments area of Kedungwarak watershed is 30.76 km2 with total length of river is 68.96 km By using design flood 1000 years is obtained spillway design, 45 meter in width, elevation of crest spillway is +161, bed elevation of dam is +159 and elevation of crest main dam is 164.25. The design of stilling basin uses USBR Type III with 3.5 m in length. After getting the design of spillway, stability analysis is done. Stability analysis consists of stability of rolling, shift, and crack. This analysis is done in the most critical condition, when water surface is as high as spillway crest and as high as the design flood. The result of stability analysis shows that spillway stability full fills the requirement.


Contributor :

1. Ir. ABDULLAH HIDAYAT, SA.
Dr. Ir. EDIJATNO

Date Create : 17/07/2009
Type : Text
Format : pdf
Language : Indonesian
Identifier : ITS-Undergraduate-3100008033502
Collection ID : 3100008033502
Call Number : RSS 627.883 Sus p


Source :
Undergraduate Theses, Civil Engineering, RSS 627.883 Sus p, 2008

Tidak ada komentar:

Posting Komentar